  • SAMARCO – Tailings Filtering Project

    Conceptual, Basic and Detailed Project of Tailings Filtering for the treatment of tailings from Concentrator 3, located in the city of Mariana - MG. The completion of this project will allow Samarco to resume its productive operation.

  • CSN - ITABIRITES PLANT

    Conceptual and Basic Project of a new plant for the treatment of Itabirites 10 Mtpy. This plant, located in the city of Congonhas - MG, in addition to processing the itabirite ore from the Casa de Pedra mine of CSN, also includes a Tailings Filtration unit.

  • VALE – Cauê facilities adequacy project to ROM 2012 – Itabira – MG

    Beneficiation Plant – 26 mtpy (7 mtpy sinter feed and 19 Mtpy pellet feed) – Conceptual / Basic / Detailed Engineering developed by ECM. Project implemented using Project Automation technology (3D).

  • VALE – Conceição facilities adequacy project to ROM 2014 – Itabira – MG

    Beneficiation Plant – 19.2 Mtpy – Conceptual / Basic / Detailed Engineering developed by ECM. Project implemented using Project Automation technology (3D).

  • ANGLO AMERICAN – Minas-Rio Project – Conceição do Mato Dentro – MG

    Beneficiation Plant / Pipeline – 26.5 Mtpy – Conceptual, basic and detailed engineering and Procurement.Large scale project for the treatment of lower-grade ores, adopting new technologies and large equipment. The project includes Beneficiation Plant, pipeline and receiving and filtering at Port of Açu – RJ.

  • VALE – Conceição Itabiritos Project – Itabira – MG

    Beneficiation Plant – 12 Mtpy – Conceptual / Basic / Detailed Engineering.Project under development with Project Automation Technology (3D). Hiring of services via LTA-Vale contract.

  • VALE – Carajás – additional 40 MTPA

    The Additional 40 mtpy plant aims at increasing the iron ore production (hematite with 62-65% Fe) of VALE Northern System at 40mtpy, expanding the capacity of the current production in 40%, increasing from 100 to 140 mtpy with the implementation of BSMV, Secondary and Tertiary Crushing, Surge Yard, Screening, Storage Yard, Shipping and Loading. The dry operation of ROM ore will be processed. The project is currently with 99.9% of physical progress and the implementation at the site with 75% completed.

  • SAMARCO – Fourth Pelletizing Plant – Mariana – MG

    Beneficiation and Pelletizing Plants – 10,5Mtpy of Concentrate / 8.25Mtpy of Pellet – Basic and detailed engineering. Technical support for construction.

  • SAMARCO – Fourth Pellet Plant Project – Ubu – Es

    Pelletizing plant – 8.25 Mtpa of Pelotas. Conceptual design, basic and detailed. Technical support works.

  • MUSA – Detailed Engineering – ITM Oeste – Itatiaiuçu – MG

    Beneficiation Plant – 3.4 Mtpy – Detailed Engineering.Project of the utmost importance in Usiminas vertical operations.

  • SAMARCO – Third Pelletizing Plant Project – Mariana – MG / Ubu – ES

    Beneficiation Plant and Pelletizing Plant – 7 Mtpy of concentrate / pellet – Conceptual, basic, detailed engineering and technical support to construction.Ramp-up project curve is now the benchmark of BHP Billiton and Vale.

  • VALE – Brucutu Project – São Gonçalo do Rio Abaixo – MG

    Beneficiation Plant – 24 Mtpy of products – Conceptual, basic and detailed engineering; technical support to construction; preparation of the commissioning plan / preparation of specific documentation, support for development / automation system integration and support to commissioning and testingThe largest Iron Ore Beneficiation Plant in the world in initial capacity.

  • MIRABELA MINERAÇÃO DO BRASIL – Santa Rita Project – Ipiaú – BA

    Beneficiation Plant – 6,4 Mtpy of feed – Basic and Detailed Engineering, as built, technical support to construction, support to commissioning and testing and procurement support.Project developed under the Super Fast Track regime, with ECM’s effective participation in the management of project implementation.

  • VALE – Sossego Project – Canaã dos Carajás – PA

    Beneficiation Plant – 15 Mtpy of feeding – Conceptual, basic, detailed engineering, support to Procurement, technical support to construction.Project developed under the Super Fast Track, rack, start-up regime, performed 4 months before the deadline. Only copper sulfide plant in operation by Vale.

  • ANGLO AMERICAN – Ferro Amapá Project

    Pedra Branca do Amapari – AP – Beneficiation Plant – 6.0 Mtpy – Conceptual, basic, detailed engineering and Procurement.Project developed under the Super Fast Track regime. Just 16 months between the start of engineering until the first shipment of concentrate.

  • VALE – Abóboras grinding/screening system detailed engineering – Nova Lima – MG

    Beneficiation Plant – Detailed Engineering.

  • VALE – Brucutu 5th Line Project – São Gonçalo do Rio Abaixo – MG

    Beneficiation Plant – 37.5 Mtpy ROM – Basic and Detailed Engineering.Expansion of existing plant to maintain production capacity due to changes in Fe ROM content.

  • VALE – Carajás Iron Ore Treatment Facilities Repowering Project for 82.5 MTPY – 1st. phase – 70 MTPY – Carajás – Parauapebas – PA

    Beneficiation Plant – Increase of 14 Mtpy of products, from 56 to 70 Mtpy – Conceptual, basic and detailed engineering.

  • VALE – Pellet Feed Production Facilities– PPL1 – Carajás – Parauapebas – PA

    Beneficiation Plant – 4.5 Mtpy of product – Conceptual, basic and detailed engineering, in operation since 2002.Design for the production of Pellet Feed, with the largest Ball Mills at the time, to feed the pelletizing facilities in São Luís.

  • VALE – IB-III Facilities at Alegria – Mariana – MG

    Beneficiation Plant – 8 Mtpy of products– Conceptual, basic and detailed engineering

  • VALE – Mina do Pico Facilities – Itabirito – MG

    Beneficiation Plant – 9 Mtpy of products – Conceptual, basic and detailed engineering.First Project for Itabirite iron ore treatment from MBR (now Vale).

  • VALE – Direct Reduction Fines Facilities Project – Carajás – Parauapebas – PA

    Beneficiation Plant – 1.8 Mtpy of product – Conceptual, basic and detailed engineering.

  • VALE – Project of the Iron Ore Handling, Storage and Reclaiming Yard Facilities – Yards C and D – Carajás – Parauapebas – PA

    Beneficiation Plant – ore – 870,000t.Manganese – 1,157,000t.Solids – 24,800t – Conceptual, basic and detailed engineering.

  • VALE – Gongo Soco Project – Barão de Cocais – MG

    Beneficiation Plant – 3 Mtpy – Basic and detailed engineering.

  • VALE – Third Plant Expansion Project – Tapira – MG

    Beneficiation Plant – Increase production from 1.56 to 1.93 Mtpy – Basic and detailed engineering for the extension and optimization of the existing installations, to enable increased production of phosphate rock (concentrated) to produce 1.93 million t / yr conventional concentrate and 100,000 t / year ultrafine concentrate.

  • VALE – Primary Yard Project for Ore and Raw Material L and M – Vitória – ES

    Pelletizing Plant – Basic and detailed engineering

  • VALE – Limestone Grinding Facilities Project – Vitória – ES

    Pelletizing Plant – Conceptual, basic and detailed engineering.

  • VALE – PFF Recovery at ITM-D – Mina do Pico – Itabirito – MG

    Beneficiation Plant – Basic and detailed engineering and CAPEX.

  • VALE – Design of the fired pellets transportation system from CVRD K Yard to CST Storage yard – Vitória – Tubarão – ES

    Pelletizing Plant – transportation of 8,000 t/h – Conceptual, basic and detailed engineering and CAPEX.

  • SAMARCO – Fazendão Project – belt conveyors system – Mariana – MG

    Beneficiation Plant – Basic engineering and CAPEX, detailed engineering, technical analysis of proposals and comments on Vendor’s Drawings (VD).

  • SAMARCO – Pipeline New “Booster” Station – Abre Campo – MG

    Pumping Station.

  • SAMARCO – Infrastructure Project (earthwork, drainage, paving and urbanization) plant II – Germano – Mariana – MG

    Beneficiation Plant.

  • SAMARCO – Slime Fine Recovery – Mariana – MG

    Beneficiation Plant – 700,000 t/year of concentrate – Conceptual, basic and detailed engineering.

  • MINERAÇÃO TABOCA – Coarse Tailing Project (turn key) – Pitinga – AM

    Beneficiation Plant – 6.5 Mtpy of feed – Conceptual, basic and detailed engineering.Design developed in partnership with Metso/Milplan/WEG for turn-key implementation of a Cassiterite (Tin) Coarse Tailings’ treatment facilities.

  • VOTORANTIM – Filtering and Storage / Shipment of concentrate project for the relocation of Usicon C – Vazante – MG

    Beneficiation Plant – 440,000t / year – Basic and detailed engineering.

  • VOTORANTIM – Project for increasing the capacity of the recovery system of zinc and wastewater treatment – Três Marias – MG

    Beneficiation Plant – increase capacity of the current treatment system from 13,500 m³/day to 18,500 m³/day.

  • VOTORANTIM – Project for pumping 3rd slime to the dam – Três Marias – MG

    Beneficiation Plant – increase capacity of the current tailings pumping system from 136m³ / h to 195 m³ / h.

  • VOTORANTIM – Project of the three leaching tanks – Três Marias – MG

    Beneficiation Plant.

  • VOTORANTIM – Project for the installation of press filter at Usicon C filtering – Vazante – MG

    Beneficiation Plant.

  • VOTORANTIM – Project to implement the raw silicate treatment system in autoclave – 2nd. stage – Três Marias – MG

    Beneficiation Plant – 49 t/h of silicates processing – dry basis.

  • VOTORANTIM – Debottlenecking Project – Três Marias – MG

    Beneficiation Plant.

  • VOTORANTIM – Tailings Thickening and Pumping Project – Vazante – MG

    Beneficiation Plant – 145,000t of tailing / year – Basic and detailed engineering

  • VOTORANTIM – Willemite and Calamine Plant Expansion – Vazante – MG

    Beneficiation Plant – 270,000 t/year of zinc silicate concentrate – Conceptual, basic and detailed engineering.

  • ALUNORTE – Alumina Calcination – Plant 3 – 3000 TPD – Filtering and Calcination – Barcarena – PA

    Calcination and Filtering Plant – Increase from 2 to 3 Mtpy of alumina – Basic and Detailed Engineering and support to Procurement, in operation since 2002.

  • CADAM – Selective Flocculation Project / Reagents Plant /Spray Dryer 2nd. stage – Monte Dourado – AP/PA

    Beneficiation Plant – Doubling of production – Conceptual, basic and detailed engineering.

  • VALE – Alegria Magnetic Separation Detailed Engineering – Mariana – MG

    Beneficiation Plant – Detailed Engineering.

  • VALE – Lump Ore regrinding detailed engineering – ITMD – Itabirito – MG

    Beneficiation Plant – Detailed Engineering.

  • KIOCL – Kudremukh Iron Ore Company – KIOCL – India

    Beneficiation Facilities – Basic engineering.